What a custom website costs in 2026, and what moves the number

In 2026 a landing page runs roughly $1,500–4,000, a marketing site $6,000–20,000 and an ecommerce build $10,000–40,000 with a US agency, and materially less with a European studio. Price is driven by content, the number of unique templates and functionality — not by page count, which most people assume and which matters least.
Ask five agencies what a website costs and you will get five ranges that barely overlap. That is not evasion. It is because “website” describes three different products.
The ranges
Typical 2026 pricing from a US agency:
| Project | Range |
|---|---|
| Landing page | $1,500 – 4,000 |
| Marketing site, 5–10 pages | $6,000 – 20,000 |
| Advanced business site | $15,000 – 40,000 |
| Ecommerce | $10,000 – 40,000+ |
| Web application | $40,000 upward |
A European studio of comparable standard typically lands at forty to sixty percent of those numbers. That is a cost base difference, not a quality difference, and it is the whole reason nearshore arrangements exist.
The three products sold under one word
A template with your content in it. A purchased theme, your logo, your text. Days of work. Entirely legitimate if what you need is to exist online.
A site built around your content. Structure derived from what you sell and to whom. Copy written rather than filled in. Design that comes out of your identity.
A site built to generate enquiries. Everything above, plus keyword research before the structure, technical search foundations, conversion tracking, and measurement after launch.
Most disappointment in this category comes from paying for the first and expecting the third.
What actually moves the price
Clients assume page count. In practice the order is:
- Content. Who writes the copy and where the photographs come from. The largest line item and the one most often left out of quotes entirely.
- Unique templates. Ten pages sharing one layout is one design job. Five pages with five layouts is five.
- Functionality. Booking, calculators, logins, integration with another system. Each one changes the order of magnitude.
- Commerce. Catalog, cart, payment, shipping, tax rules. Substantially more complex than a marketing site.
- Languages. A second language is not a translation. It is a parallel branch with its own URLs and its own hreflang setup.
- Page count. Last, and least.
The costs quotes leave out
Building a site is not owning one. Annually, budget for:
- Domain — $10 to $30
- Hosting — $50 to $500, depending on platform and traffic
- Maintenance — nothing if you run it, $50 to $200+ a month if you do not
- Plugin or app licences — common on WooCommerce and Shopify, $100 to $400 a year
- Payment processing — a percentage of every transaction
- Content — photography and copy, if you are not producing it yourself
A quote that mentions none of these is not cheaper. It has moved the costs to later.
How to compare two quotes honestly
Make them describe the same thing before comparing numbers:
- Who writes the content, and what happens if it is not supplied on time?
- How many unique page templates are included?
- How many revision rounds, and what does an extra one cost?
- What is the post-launch fix period?
- Who owns the source files, the hosting and the domain?
Two quotes that answer those five identically are comparable. Two that do not are not, regardless of what the totals say.
The question underneath
Before asking what a site costs, work out what one customer is worth.
If your average project is $20,000, a $12,000 site pays for itself on the first enquiry and the argument is over. If your average sale is $50, the arithmetic is completely different and a template site is probably the right answer.
A website is not expensive or cheap in the abstract. It becomes one or the other depending on what it is being asked to do.
Common questions
Why do quotes for the same site differ by five times?
Because they are not the same site. One is a purchased theme with your text in it, one is designed around your content, and one includes research, copywriting and a measurement setup. All three are called a website. Problems start when someone pays for the first and expects the third.
What are the ongoing costs?
Domain $10–30 a year, hosting $50–500 a year depending on traffic and platform, and maintenance from nothing if you run it yourself to $200 or more a month if you do not. Ecommerce adds transaction fees and often paid apps.
Is a cheap site ever the right call?
Yes. If you need presence rather than acquisition, and your average customer is worth a small amount, a template site is the correct commercial decision. The mistake is buying one and expecting it to generate enquiries.


